Northern Beaches Transport Review Sparks Push for Metro Rail to Dee Why and Brookvale

A major transport review covering the Northern Beaches is open for public feedback, triggering a fierce local push to get a metro rail line to Dee Why and Brookvale onto the dynamic planning agenda for the first time.



The Northern Beaches Network Review examines how the peninsula’s main road and public transport networks are performing. The official scope targets five key arterial corridors: Mona Vale Road, Warringah Road, Military and Spit roads, Pittwater Road, and the Pacific Highway.

But local community advocates, business groups, and regional leaders are hitting back, warning that the official strategy focuses too heavily on short-term fixes while ignoring the massive structural changes the peninsula desperately needs.

The case for metro rail

The Northern Beaches still has no rail connection. Buses and private cars fight for space on the same gridlocked corridors, and while the B-Line has made a massive dent in transit times since launching in late 2017, the network is hitting its absolute ceiling.

Photo Credit: Transport NSW Blog

A formal community backlash is now gathering momentum, demanding that planners fast-track the “investigation of a mass transport solution such as a Metro rail to Dee Why and Brookvale” before the region bottlenecks completely.

Local submissions are also calling for aggressive bus priority upgrades north of Mona Vale, grade-separated cycleways, and immediate engineering fixes for notorious intersection logjams that the current official review largely glides over.

Photo Credit: NSWGov

For Dee Why commuters heading south to the CBD, daily trips remain an exercise in frustration due to shifting bus reliability and relentless Pittwater Road gridlock. The notorious Officeworks intersection in Dee Why stands out as a prime pain point in local feedback.

What is currently on the table?

The official review sticks to practical, medium-term adjustments. Key proposals include an east-west B-Line link connecting Dee Why to Chatswood’s existing Metro station, alongside stronger bus priority lanes along Pittwater, Military, and Spit roads.

Several major road upgrades are also rolling out across the region simultaneously:

  • Mona Vale Road West: Detailed design work and site investigations are moving forward to widen a 3.4-kilometre stretch from two lanes to four between Terrey Hills and Ingleside, which includes a new northern shared path.
  • Wakehurst Parkway: Safety works, intersection upgrades, and flood mitigation projects are progressing between Frenchs Forest Road and Pittwater Road in North Narrabeen.

While these projects offer welcome relief, residents argue they are minor Band-Aids on a much larger systemic problem.

Density is coming, and the roads aren’t ready

The clock is ticking for the peninsula’s transport infrastructure. High-density residential zoning is ramping up across major hubs, with Mona Vale, Frenchs Forest, Brookvale, and Dee Why all locked in as designated growth zones. New planning reforms mean developments can now scale up to six storeys along these transit corridors.

Photo Credit: NSWGov

Locals are warning that piling thousands of new residents into these areas without heavy mass transit infrastructure will completely paralyze local roads. The message from community leaders to infrastructure planners is clear: critical enabling infrastructure must pave the way for density, not trail behind it by a decade.

Tinkering around the edges simply will not cut it anymore when there are only a few bottleneck roads in and out of the peninsula.

Have your say by June 15

The community feedback window has been extended to Monday, 15 June 2026, to give residents more time to log their experiences. Locals can pinpoint exact problem intersections or congested corridors using the interactive map on the official Have Your Say platform, complete a travel survey, and download the full 30-page summary report.

To submit your feedback online, head to NSW Gov before the June 15 deadline.



Published 29-May-2026

Dee Why Commuters See Relief as Bendy Buses Return

Dee Why locals who’ve been stuck waiting for crowded, delayed buses are finally catching a break—those long bendy buses are making a comeback.



Bendy Buses Back in Dee Why After Long Absence

Commuters in Dee Why are finally seeing signs of relief as bendy buses begin returning to Northern Beaches routes after a six-month absence that caused widespread delays, overcrowding and frustration.

Photo Credit: Simon_sees/Flickr

Bendy buses were pulled from service in October 2024 after cracks were found in the chassis of the 83-vehicle fleet, forcing key routes like the 190X to run fewer services and leaving areas like Dee Why feeling the impact.

Repairs Underway, Services Slowly Restoring

Transport for NSW launched a major rebuild of the buses, involving structural reinforcements and moving the rear doors to improve stability. As of April 2025, the first six repaired buses are back on the roads. The rest are expected to follow progressively over the coming months.

Photo Credit: Simon_sees/Wikimedia

State officials say the return of bendy buses is key to easing pressure on busy routes like the 190X, which is slowly being restored. In Dee Why, where many rely on regular service to the city and nearby suburbs, it signals the start of a more stable commute.

Community Disruption in Dee Why

When the bendy buses were pulled, the 190X lost nearly a quarter of its trips, leading to longer waits and packed buses. In Dee Why, some commuters were left stranded by delays and cancellations.

Photo Credit: Simon_sees/Flickr

Residents reported longer travel times and difficulty securing seats during peak hours. Bus operators scrambled to fill the gap with alternative vehicles, but without the same passenger capacity, these replacements struggled to meet demand.

New Buses Coming by Year’s End

To prevent future disruptions, the NSW Government is investing in 60 new buses, including 50 articulated models like the current bendy fleet and 10 double-deckers. Some of the new buses will be cleaner, low-emission or fully electric.



The first of these new buses are expected to roll out by the end of 2025. Transport for NSW has confirmed that the Northern Beaches will be a key focus area for these upgrades, ensuring that suburbs like Dee Why receive continued attention as one of the region’s busiest corridors.

Published 21-April-2025