NBC’s funded Dee Why bike cage project has reached procurement, with plans to provide covered parking for up to 20 bicycles near the beachfront surf club.
Public consultation took place between 4 August and 3 September 2023, followed by detailed design in 2024. The NBC’s capital works tracker lists the project as being in procurement. The proposed cage will sit against the eastern wall of the public amenities block near Dee Why Surf Life Saving Club. Plans include extending the building’s roof over the parking area and installing lighting and CCTV. The enclosed parking area will add to existing cycling facilities on The Strand, where riders already have access to a repair stand and separated cycleway.

Annual Permits For The Dee Why Bike Cage
Cyclists would need to purchase an annual bicycle parking permit to enter the cage. The arrangement drew concerns during consultation about how occasional beach visitors would use the facility without committing to a yearly fee. Some respondents supported secure bicycle parking but wanted more flexible entry arrangements. One suggested accepting Opal or credit cards so that people making spontaneous trips to the beach could also use the cage.
NBC said it could not offer Opal access at the time and would investigate options for casual use. The current beachfront permit price and arrangements for occasional visits remain unconfirmed in the published project information.
Support And Concerns Over The Beachfront Location
The NBC’s community engagement report recorded 87 contributions, including 85 online responses and two written submissions. Among online respondents, NBC reported 59 per cent support, 18 per cent support with changes and 20 per cent opposition. A further 4 per cent were unsure or preferred not to answer, with the reported percentages rounded.
Supporters saw secure parking as a way to make cycling to the beach easier. One respondent questioned whether the proposed capacity would be sufficient, while others doubted whether the cage would attract enough users to justify the expenditure. Some respondents preferred additional bicycle racks or improvements to cycling routes. Others raised concerns about the visibility of the selected site and whether it offered enough natural surveillance.
NBC said available space and the surf club’s requirements influenced the location, with lighting and CCTV included to address security concerns. The engagement report also recorded in-principle support from Dee Why Surf Life Saving Club. The adopted 2025/26 Operational Plan and Budget allocated $65,000 from developer contributions towards the bicycle storage project. NBC’s project page identifies construction funding from both the NSW Government and council’s operational budget. The beachfront cage will follow a similar design to existing secure bicycle parking facilities at the PCYC car park in Dee Why and Whistler Street car park in Manly.